Lean Manufacturing on the Shop Floor: Cutting Waste with 5S, Kaizen and Standard Work
98 spot(s) remaining
Description
Lean is not a project for consultants. It is a daily habit on the shop floor. This session shows how Malaysian manufacturers have used 5S, short kaizen events and standard work to reduce defects, free up floor space and shorten lead times without large investment.
Participants will map the seven wastes in a typical production line and leave with a 30-day plan for one pilot area in their own plant.
Agenda
-
1The seven wastes
Recognising overproduction, waiting, transport, over-processing, inventory, motion and defects.
-
25S that lasts
Sort, set in order, shine, standardise and sustain, with audit checklists that supervisors actually use.
-
3Running a kaizen event
Choosing the problem, forming the team and measuring before and after.
-
4Standard work and visual management
Work instructions, takt time and simple boards that show the status of the line.
-
5Your 30-day pilot plan
Picking a pilot area and the measures that will show progress.